Traffic arrangements on the Attic Road from Friday night – Exits closing

Traffic arrangements will take place from 22:00 on Friday night 8/03 to 6:00 on Saturday morning 9/3 and will influence exits to L. Tribe, Koropi, the entrance of the Duchess Plakentia (comb 13) in the current to Elefsina and the West branch of the West Regional Avenue Hymetou in the direction towards Brilissia/Elefsina. In particular, due to scheduled heavy maintenance work on the Attica Road: 1. Closed will remain from 22:00 on Friday night 08/03/2024 to 06:00 on Saturday morning 09/03/2024, the exit of Attica Road to L. Race (node 6) in the current to Airport. During the above blockade, drivers can exit the highway at the next exit to L. Republic (node 7). 2. Closed will remain from 22:00 on Friday night 08/03/2024 until 06:00 on Saturday morning 09/03/2024, the entrance of the Attica Road from Koropi (node 20) to the current to Elefsina. During the above blockade, drivers can continue their journey to the Airport, exit at the next exit to Local Roads (K1 knot), reverse and move to Athens – Elefsina. 3. Closed will remain from 22:00 on Friday night 08/03/2024 until 06:00 on Saturday morning 09/03/2024, the entrance of the Duchy of Plakentia (comb 13) of Attica Road to Elefsina. During the above blockade, drivers can alternatively make use of the entrance of Pentel Avenue (node 12) to the current to Elefsina. 4. Closed will remain from 22:00 on Friday night 08/03/2024 to 06:00 on Saturday morning 09/03/2024, the western branch of the West Regional Avenue of Ymettos in the direction to Brilissia / Elefsina. During the above blockade, drivers can move as follows: – Straight to Markopoulos – Airport, through the connecting branch of the Leontario Node (Node Y7), to the Service Station. Paiania motorists (S.E.A. Mesogeion), where they will reverse in the direction towards Elefsina, or – Straight to Rafina, then reverse to Elefsina through the Pallini Node (Knode Y8) without repayment of toll fee. Attiki Street asks drivers to pay particular attention to the relevant marking and to respect the speed limits in the sections in which heavy maintenance operations are under way.