More than 15 apartment buildings in Athens’ Kypseli neighborhood have developed sudden cracks, prompting residents to raise concerns about structural safety and demand answers from Elliniko Metro, the state-owned company overseeing construction of Metro Line 4.
The issue comes just weeks after the partial collapse of a residential building in Petralona — reigniting fears among Kypseli residents already anxious about damage linked to ongoing underground works. The affected buildings are mostly older structures, adding urgency to concerns over stability and long-term safety.
According to reports by the newspaper Nea, ground subsidence of 18–20 cm has been recorded in parts of the area. Residents have reported cracks in load-bearing columns and walls, falling plaster, tile detachment, and broken marble surfaces. In response, tunneling operations by the metro contractor beneath Kypseli have been temporarily suspended.
The matter is expected to be brought before today’s meeting of the Athens Municipal Council — the same body that signed a cooperation memorandum with Elliniko Metro in January 2022 for the construction of Line 4.
This is not the first time Kypseli has faced alarm over construction-related anomalies. In April, residents sounded the alarm after ‘liquid concrete’ began seeping from a well in an old house in the neighborhood. Days later, a nearby furniture store’s basement flooded, and cracks appeared in that same apartment building.
Given the age and density of many buildings in Kypseli, residents are urgently seeking official clarification on key technical details — including the extent of subsidence, excavation depth, and monitoring protocols. While the contractor has indicated willingness to repair damages, it has yet to provide the written responses formally requested by residents.