Today (15 July 2026), a major wastewater infrastructure initiative by EYDAP—the €1 billion programme for Eastern Attica—was presented at the Greek Ministry of Environment and Energy (YPEM), under the initiative of Minister Stavros Papastaurou. The broad-based meeting brought together YPEM’s political leadership, EYDAP’s management, MPs from the First Electoral District of Eastern Attica, and mayors of the affected municipalities.
A Landmark Project for Eastern Attica
EYDAP detailed the full scope of the wastewater programme—the largest of its kind in Europe—during the session. To date, work is underway at 70 intervention sites. Funding approvals total €530 million, while an additional €470 million is allocated to projects in the design phase and €255 million to those entering tendering.
The project is expected to benefit approximately half a million residents across the Attica basin. For decades, much of Eastern Attica relied on septic tanks rather than modern sewerage systems—a situation that led Greece to incur repeated EU fines for non-compliance with Directive 91/271/EEC on urban wastewater treatment.
Closing a Longstanding Gap
Once completed, the EYDAP programme will fully resolve this long-standing regulatory gap. It will deliver 1,500 kilometres of new sewer pipes and three Wastewater Treatment Plants (WWTPs) in total.
In his remarks, Minister Papastaurou underscored the transformative impact of these large-scale infrastructure works: “Half a million fellow citizens across 13 municipalities in Attica are already witnessing, day by day, the comprehensive wastewater network and treatment facilities being built. Together with mayors, MPs and EYDAP, we are uniting our efforts toward integrated water management—covering drinking water supply, irrigation and wastewater treatment—to tackle water scarcity, improve daily life and elevate quality of life for all citizens.”