Approved the Tender for the assignment of the study for the lake of Ioannina

The Economic Committee of the Region of Epirus in today’s meeting, among other things, approved the minutes of the …
The Tender committee for award of the study of water flow in the embankment Amfithea –
operation of sports facilities and the protection of riparian land areas Amfithea and of Perama (Ioannina lake), προεκτιμώμενης expenditure 233.391,49 euro. The study is entrusted to the design shape – partnership “Παπασπυροπούλου Konstantina Georgiou, Mavridis Thomas of Themistocles, Κανονίδης Kosmas of the Kingdom, Τζηρίνης Apostle of Themistocles, Καραμπατάκης Dimitrios Athanasiou.
Also the Financial Committee has approved the tender for two road projects in Bc.E. Arta. The first concerns maintenance of the National Road Antirrio – Arta (within limits E.E. Arta) with a budget of 120,000 euros and the second restoration of the 16 provincial road in places Lepiana and Μικροσπηλιά, with a budget of 60,000 euros.

Source

Exit mobile version